Humphrey Perkins School: English and Maths Modular Teaching Block

State-of-the-art English & Maths Modular Teaching Block

Our 13-classroom block at Humphrey Perkins School is just one of several projects we have worked on with Surveyors 2 Education in recent times. Together, we have overseen the replacement of a dilapidated temporary mobile with a state-of-the-art two-storey bespoke English and maths block which has enabled us to bring our departments together and create some fantastic spaces for our students to thrive
— Oliver Willis, Project Manager, Lionheart Educational Trust

Timeline

  • Feasibility – October 2021

  • Planning application – December 2021

  • Out to tender – February 2022

  • Return – March 2022

  • Start on site – May 2022

  • Completion – December 2022

    Budget: £3.3 million

The Task - Doing Amazing Things

Humphrey Perkins is a secondary school with a 300-year-old history and a commitment to the highest standards.

We believe education is about instilling values and creating dreams, and that all our students can do amazing things with their lives, whatever their background and abilities.

Our new teaching block with 13 classrooms and an IT suite is pivotal to this vision.

The Solution – Heart of the School

With a difficult economic market requiring value engineering, S2e made sure we derived maximum value from every penny spent. Challenges included a very tight area of work in the heart of the school and the need to minimise disruption from noise, builders and deliveries around exam time (and throughout the project.)

Because we wanted to have construction complete as soon as possible, S2e advised a modular build that was nevertheless designed to look very much like a traditional build. We are delighted that it is architecturally and aesthetically pleasing both inside and out.

With most of the works completed in a factory and finishes applied on site, modular gave us a more controlled, less disruptive and quicker build.

Before

Architectural visulisation

Completed building

Start to Finish

S2e provided full consultancy services from inception to completion, including:

  • feasibility

  • architecture and design

  • tender/procurement

  • cost control

  • appointing a contractor

  • project management

  • health and safety

  • mechanical and electrical engineering

  • structural design.

They overcame difficult ground conditions, upgraded electrical capacity to ensure the new block had enough power for all lighting and heating, and installed environmentally friendly solar panels on the roof along with an energy-efficient heating and ventilation system.

The Outcome - Problem Solving

S2e have solved our shortage of available teaching space with a brilliant contemporary addition to our school.

We have a two-storey teaching block with 13 classrooms and an IT suite. It includes a server room, WCs and accessible WCs on each floor, office and storage rooms and a platform lift next to the stairs. Our students can continue to do amazing things in superb new surroundings!